The project consisted of a two stage cooling system for dissipation of heat generated from electrical gas transformers and shunt reactors, which provided the required cooling capabilities whilst retaining the operational flexibility normally associated with redundancy in the main plant equipment.
The project was designed to power generation standards.
The mechanical services were designed with finite precision to meet the clients detailed checking procedures and understandable attention for detail for such a technologically advanced
installation.
All drawings were produced in 3D to assist the contractors and minimize working drawing and eliminate on-site clashes.