Leeds Bridge Street

780 APARTMENTS & 192 BEDROOM HOTEL AS PART OF A MIXED URBAN REGENERATION


© 2024, MKP Consultants Limited

Leeds Bridge Street

780 APARTMENTS & 192 BEDROOM HOTEL AS PART OF A MIXED URBAN REGENERATION

_

MKP provide a complete design solution for the full range of mechanical, public health and electrical building services, for any size of project from small condition surveys through to major developments. Tailored engineering solutions are provided to the highest standards and guidelines.

_

_

MKP provide a complete design solution for the full range of mechanical, public health and electrical building services, for any size of project from small condition surveys through to major developments. Tailored engineering solutions are provided to the highest standards and guidelines.

_

_

MKP provide a complete design solution for the full range of mechanical, public health and electrical building services, for any size of project from small condition surveys through to major developments. Tailored engineering solutions are provided to the highest standards and guidelines.

_


© 2024, MKP Consultants Limited

Leeds Bridge Street

780 APARTMENTS & 192 BEDROOM HOTEL AS PART OF A MIXED URBAN REGENERATION


© 2024, MKP Consultants Limited

Leeds Bridge Street

780 APARTMENTS & 192 BEDROOM HOTEL AS PART OF A MIXED URBAN REGENERATION

MKP worked with Singapore-based property developer Heeton Holdings Ltd as part of the consortium behind the landmark project, which will create an urban destination on the 2.45-acre site formerly occupied by British Gas.

The scheme is set in an ideal location in the city centre, close to the Victoria Gate shopping centre and the emerging creative quarter.

 

The construction of the new 14-storey Hampton by Hilton will be phase 1 and the 192-bed hotel has an anticipated opening date of late 2019.

The second phase of the overall masterplan would provide 780 apartments in five new buildings ranging from 11 to 41 storeys.


© 2024, MKP Consultants Limited