Case Study
Silkstream
Silkstream is a major residential regeneration scheme in Hendon, North London, developed by St George, part of the Berkeley Group. MKP is currently delivering the full mechanical and electrical services package across multiple phases of the site.
Delivered works to date include: Completion and handover of Blocks 1 and 5, white box installations for the Sainsbury’s commercial unit, gym and cinema spaces. Exhaust Air Heat Pumps installed in every unit, providing energy-efficient heating and hot water without the need for a central plant. Full smoke and car park ventilation systems, integrated car park management and BMS systems as well as advanced fire alarm and security installations.
The development exceeds current energy performance standards and prioritises low-carbon, future-proof living. Silkstream reflects our strong, ongoing partnership with the Berkeley Group, having recently completed work on their SQP4 project and continuing our delivery at Fulham Reach.
MKP have a proven track record in both providing detailed design for clients from first principles and being brought in to provide more cost-effective designs that not only meet or better the budgets but can offer added value through reduction in plant and services space. MKP delivers fully integrated, flexible, safe, reliable and sustainable design solutions that satisfy the highest performance criteria while providing maximum value for money.